|
M. Moore Construction - Basement Remodel
Photos: Ed Goham 7/14/04 (330) 686-7726 MMooreConstruction@neo.rr.com |
|
Navigation hint: Click the logo on any project page to return to the main Project Picture collection.
Click on the thumbnail images to display larger versions.
Client is relocating to a new home. Several projects to be completed, the first of which is a basement configuration change. Day one includes building a stud wall, with a rough in for a pass-through door and a closet. The drywall is hung, j channel along the top edge, tear away strips along the concrete block walls, fiberglass mesh tape in the seams and inside corners, and joint compound filling the field screw holes.
|
|
|
|
|
|
|